Base machine
- Stations named on the quotation (fill, place, crimp, gasser) with the work envelope and connected load stated for those stations only.
- Standard crimp tooling matched to the can-neck and valve drawings attached to the RFQ, plus PLC interface notes for start/stop and reject signals.